HUTTER FREI POWER GmbH


References of Steam Turbine CHP Stations

Steam Turbine CHP Station STORA ENSO UETERSEN 1:

Process Description:

  • The existing heating plant contains 2 high-pressure steam generators, the live steam of which were formerly fed into an extraction-condensing steam turbine for generating electricity.
    After the retirement and dismounting of the steam turbo set with the ancilliary systems and the piping systems, Stora Enso decided at the end of 2006 to install a new steam turbo set.
  • For this purpose the existing heating plant was extended with an extraction-back-pressure steam turbo set. The steam turbo set was installed downstream of the two steam generators and the exhaust steam supplies the process steam for the paper machines.
  • Because of the economic benefits, a used steam turbo set has been ordered, which fits to the existing steam data and allows future extensions. The used steam turbo set has after the purchase been modernised and retrofitted.
     

Technical Main Data:

Commissioning & Hand-over

2007

Annual Operation Hours

8600 h

Steam Turbine Type

Used Extracton-Back-pressure

Nominal Electrical Power Output Steam Turbo Set

7.0 MW

Nominal Total Electrical Capacity

7.0 MW

Nominal Live Steam Massflow to Steam Turbine

57 t/h

Nominal Live Steam Condition

42 bar

460 °C

Process Steam Pressure

3.9 bar

Fuel

Natural Gas

Installed Firing Rate Boiler

2 x 22.5 MW

Fuel Utilisation Factor

91 %

Time-Reliability

> 99 %

Project Scope:

Phase 1:

  • Search for and Evaluation of new Steam Turbo Sets and used Steam Turbo Sets including the investigation of the actual condition (technical assessment of condition) of the used Steam Turbo Sets and including the assessment of the necessary modernisation-, repair- and retrofitting measures and determination, which components and systems can be reused.
     

Phase 2:

  • Extension of the existing heating plant with a used extraction-back-pressure steam turbo set of type SIEMENS Görlitz BEG28 (DDR-turbine from VEB Görlitzer Maschinenbau).
    Based on the assessment of condition in Phase 1 it has been determined in detail and specified, which modernisation-, repair- and retrofitting measures at the used steam turbine, gear box, generator and of the reuseable components and systems had to be executed.
    It showed, which components and systems had to be replaced and which hydraulic control- and closed-loop control systems are replaced by electrical components and which repair mesaures had to be executed.
    The entire electrical systems of the steam turbo set including generator protection, synchronisation and excitation was replaced and delivered according to state of the art technology.
    Furthermore the entire turbine control system was replaced by a new control system and the complete electrical control of the electrical systems including generator was installed.
    Finally the entire instrumentation was replaced as well.
  • New pipe systems with tie-in of the existing steam generators and tie-in to the process steam system
  • Extension of water treatment plant
  • Extension and adaptation of the foundation based on the existing table foundation for the old extraction-condensing steam turbo set
     

HUTTER FREI POWER Scope of Services:

  • General Planning, Site Management, Erection Management & Commissioning, as well as detailled Concept of Steam Turbine Modernisation

    Phase 1:
    Search for & Evaluation of a used Steam Turbo Set in the European Market, Project Evaluation of used and new Steam Turbo Set, detailled Specification for the Modernisation, Repair and Refurbishment of the used Steam Turbo Set, Performance Upgrade of the used Steam Turbine, recommendation of Project Variant to be realised

    Phase 2 (after decision for the used Steam Turbo Set):
    Project Management, Planning, Arrangement Planning, Engineering without Electrical Systems and Civil, determination of Scope of Refurbishment and Modernisation of the used Steam Turbine, detailled Planning for the pipe systems and instrumentation of the Steam Turbine, Planning of the turbine auxiliary systems, Inquiry Specifications, Evaluation of Turbine Refurbisher, Supplier Control, Input Documents for the Automation and Controls in the Distributed Control System and Turbine Control System, Site Management, Erection Management, Commissioning and Acceptance Test Measurement
     

Customer:

  • STORA ENSO UETERSEN, Uetersen, Germany

Steam turbine CHP station Uetersen



Cookies information